Sapere was commissioned by Te Waihanga, the New Zealand Infrastructure Commission, to look at how much energy and transport infrastructure New Zealand needs to support transition to a low emissions economy. Our research modelled how long it would take to process the necessary consents under the Resource Management Act and what it might cost if New Zealand failed to develop the necessary infrastructure.
The report finds that, from 2028, consent processing times would need to be 50 percent quicker than they are projected to be under the RMA.
Auckland
Level 20, 151 Queen Street
Auckland, 1010
P +64 9 909 5810
Wellington
Level 9, 1 Willeston Street
Wellington, 6011
P +64 4 915 7590
Melbourne
Level 11, 80 Collins Street – North Tower
Melbourne, VIC 3000
P +61 3 9005 1454
Sydney
Level 18, 135 King Street
Sydney, NSW 2000
P +61 2 9234 0200
Canberra
GPO Box 252
Canberra City, ACT 2601
P +61 2 6100 6363
Perth
PO Box 1210
Booragoon, WA 6954
P +61 8 6186 1410
Brisbane
Level 18, 324 Queen Street
Brisbane, QLD 4000
P +61 7 2113 4080
Copyright © 2024 Sapere Research Group | Privacy
In Australia, liability limited by a scheme approved under Professional Standards Legislation.
Site design & built by: Wonderlab